Case Studies
At Merthyr Salvage, Reclamation and Demolition, we’ve always looked to the future and embraced every job we have come across. This awareness means we approach every site – industrial or residential, rail or road or completely non-hazardous – with the same energy and dedication.
Hover over our case studies and navigate through to select which case studies interests you.
classroom portacabin
We Dismantled unsafe classroom portacabin using hand tools, break up existing concrete walkway, install new walkways and fencing. Leaving the area safe and tidy for the children to play in the garden.
Pontymoile primary school
Pontymoile primary school demolition well under way brilliant effort by the team in the weather conditions.
TY Treharne Farm
Merthyr Salvage, Reclamation and Demolitions team started a very delicate project at TY Treharne farm. This was to take down unsafe structures for Ecoligist’s to complete their report.
NEIL EVANS SUMMERHOUSE
Merthyr Salvage, Reclamation and Demolition supplied some of the materials used in this fantastic looking summerhouse. The Rustic Natural Stone Cladding has created a stylish veneer, which has been fitted seamlessly.
Reclaiming blue Pennant flagstone paving
Client: Reclaiming blue Pennant flagstone paving Merthyr Salvage and Reclamation were responsible for the reclamation of paving slabs of the blue Pennant sandstone...
Reclamation at The Crown Public House
Client: Crown Public House, Rhondda Valley Merthyr Salvage, Reclamation and Demolition’s brief for this particular project was...
Ironmongers Shop In Pentre Rhondda.
Client: Crispy Cod Fish Bar.
Reclaimed welsh roofing slates, dressed stone and pine floor boards. WE had to take the shop down by hand which was a slow process because it was situated on a junction of a main high street with a busy flow of traffic. All completed safely and on time by by merthyr salvage team.